Location of benchmarks, location and grade for installation of storm sewer structures, and location and elevation of pot holes provided. Upon completion an as-built and record drawing will be conducted.
Utility land surveying services and plan and profile drawings of existing conditions and proposed conditions provided.
Location and grade were provided for storm and sanitary sewer structures. Upon completion of the project, an as-built land survey was conducted.
Construction of 24" diameter watermain to loop dead ends in the city of Elkhart including sidewalk and pavement replacement, and restoration along Okema Street. Construction engineering and layout services were provided.
Construction layout and certified boundary retracement surveying services provided for the city of Fort Wayne.
Construction of approx. 2400 feet of 24" diameter water main and appurtenances, drive approach and pavement replacement, and restoration along Pennsylvania Ave and Okema Street from Jones Street to Edgewater Drive to loop dead ends and improve water quality in the City of Elkhart. Bertsch-Frank provided construction engineering and layout, sidewalk grading, and final asbuilt surveying.
Professional Land Surveying services provided for the procurement and preparation of a high pressure gas main easement servicing a new Ethanol plant.
Bathymetric Survey for the repair of a sewer line under the Maumee River between the north and south Fort Wayne water pollution control plants.
Construction Engineering and stakeout for a large sewer separation and road improvement project.
Surveying and construction staking of sewer separation project through a residential area.