Project Detail
Initial survey and site design services associated with a new indoor practice football field facility containing 97,500 sf. The facility will eventually be connected to a future addition to the Guglielmino Athletics Complex via a pedestrian bridge crossing Courtney Lane. Bertsch-Frank was responsible for site plans associated with layout, demolition, grading, utilities, erosion control, and ADA walkway amenities. In addition, Bertsch-Frank participated in a group stormwater drainage study of the immediate site and downstream areas with respect to an existing retention basis located at the south end of campus.
Contact Us